A difficult nut to crack!

Hi Experts,

I'm trying to present data in a straight table in a certain way. Below is the table I have.

Tab1.PNG

The Table has Name, Appearance Order, Date and Sale value. I want to present this in a straight table using the Appearance order. For example, the Appearance order is 3 for A, so I should be able to see only last 3 Sale and date values for Name A. I want to present this data in like this in a straight table:

Tab2.PNG

Is there anyway we can do this? Either at the script level or within Qlik at expression level?

Thanks

21 Replies
Anonymous
Not applicable
Author

This is brilliant! Thanks a lot.

sunny_talwar

No problem at all

Anonymous
Not applicable
Author

Thanks again. I've another small addition to this if you can help me...

Basically I have another Date field which contains all the same dates but also future dates meaning >today()

I want to show these future dates in new columns.

So this is my new table. Same table but one new date column.

tab8.PNG

I want to show this data in straight table like this:

tab9.PNG

So you think this is possible?

sunny_talwar

Would you be able to share the app by updating this new date column in it?

Anonymous
Not applicable
Author

Sure. Here is the app and the data.

sunny_talwar

So to understand the logic.... if we Appearance order is 3, the planned date will be in increments of 3? Like A's appearance order is 3, you have 6 additional planned date. for B you have 2. Just trying to understand what would have happened if there were only 2 planned dates for A?

Anonymous
Not applicable
Author

Yep! Planned dates will be in the increment of 3. So for A there are 6 planned dates. So the first three planned dates should go to Planned Date 1 Column and thee last three should go to Planned Date 2 Column in the straight table.

If A only had 3 Planned Dates then Planned Dates 2 column should be empty as there are only 3 planned dates.

Similarly for B there are 2 future planned dates which should go to Planned Dates 1 column of the straight table and Planned Dates 2 column should be empty as there are no more planned dates.

sunny_talwar

With slight intervention in script....

Capture.PNG

Anonymous
Not applicable
Author

This is brilliant Sunny! Looks like this will do the trick. The only think I was thinking is if there is a way the Planned Date 1 and Planned Date 2 are sorted. For example, in Planned Date 1, 08/09/2017 is appearing before 07/09/2017.

Anonymous
Not applicable
Author

The other thing i noticed is that if I add new data which is Name C then it doesn't add the planned dates in Planned Date 1. Not sure what wrong here...

tab11.PNG