I uploaded an excel sheet thru data manager. In the data preparation screen, I set a date column to be Date. On import, I can see that the date was recognised as the calendar measure were created. However, dragging the field "date" onto the canvas shows nothing. Am I doing something wrong? Thanks in advance.