I'm upgrading from ver10/Server 2008 to ver11.2/Server 2012. So I'm bringing up an entirely new server that will replace the old one. I've been told that once I'm ready to go to production with the new server that all I need to do is shut the old server down, then use the same serial number/control number information that was used with the old server for the new server. Does that sound right?
Thanks!
Matt
Hi Matt,
You are correct.
Bill
Yes. But I would keep the old server available for a few more weeks, just in case.
Hi,
Yes, shutdown and offline. If you bring it on line you will have issues with the QVS service shutting down, because you are using the same key on more than one machine.
Bill
Great. Thank you, gentlemen.