Skip to main content
Announcements
Have questions about Qlik Connect? Join us live on April 10th, at 11 AM ET: SIGN UP NOW
cancel
Showing results for 
Search instead for 
Did you mean: 
Not applicable

Issue with Calendar dates

An issue with the calendar

We are having a  a look at the attachments

nly 2012 to 2014 but in server its showing . Can help me resolving this issue

Thanks in advance

3 Replies
cgdonders
Partner - Creator
Partner - Creator

Hi John,

There is probably a difference in the load script of youre calendar between the test server and production server. Can you provide more information on the Calendar load script? How do you define the calendar years? Are these based on variables or data driven?

swuehl
MVP
MVP

It's almost impossible to tell just from the screen shots. Your calendar is probably created in a load script, based on some fact dates of your input data. I assume these data differ in test and production environment.

Not applicable
Author

May be thats how the data is between the two environments. Please check the data at the extract layer. I would assume they would be different.