1 or 2 tasks for publisher (reload and distribution)

is there any best practice in this? what can be the benefit?

1 qvw:

* reload and distribution in 1 task

* reload in 1 task and distribution in a separate task (when reload is finished)

Thanks in advanced

3 Replies
nagaiank
Specialist III
Specialist III

I will go with two tasks, one for data reload and the other for distribution.

The choice may depend on the reload time and frequency of need to change distribution list.

Not applicable

Hi Amien,

if you have just a single distribution needed following a reload, there isn't much difference between a single or two tasks.

A single task will be a bit faster than the two, but overall not much difference.

Multiple tasks will come into their own when you have multiple distributions from the same reloaded QVW, a distribution per department for example, where of course splitting to a reload task and then the multiple distributions is best.

hope that helps

Joe

Peter_Cammaert
Partner - Champion III
Partner - Champion III

This is just an example:

Imagine that you have two reload tasks for the same document (just reloads). The first one will produce a small version (for example a limited number of years) on tue, wed, thu and fri. The second one will produce a complete version will all data during Sunday night because there is an important meeting on Monday morning. The distribution task will be the same for both (one task triggered by both reload tasks). This way you avoid duplication of the list of users to distribute to.

Peter