<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic TMC Same task, multiples plans, differents parameters in Talend Studio</title>
    <link>https://community.qlik.com/t5/Talend-Studio/TMC-Same-task-multiples-plans-differents-parameters/m-p/2476125#M141138</link>
    <description>&lt;P&gt;In the TMC&amp;nbsp; i need to create multiple plans that utilize the same task but with different parameters.I can't find a way to do this, is this even possible ?&amp;nbsp;&lt;BR /&gt;My task is handling differents domains with the same global logic so i don't want to split up the job in one task per domains.&lt;/P&gt;</description>
    <pubDate>Tue, 13 Aug 2024 16:52:12 GMT</pubDate>
    <dc:creator>Grutt</dc:creator>
    <dc:date>2024-08-13T16:52:12Z</dc:date>
    <item>
      <title>TMC Same task, multiples plans, differents parameters</title>
      <link>https://community.qlik.com/t5/Talend-Studio/TMC-Same-task-multiples-plans-differents-parameters/m-p/2476125#M141138</link>
      <description>&lt;P&gt;In the TMC&amp;nbsp; i need to create multiple plans that utilize the same task but with different parameters.I can't find a way to do this, is this even possible ?&amp;nbsp;&lt;BR /&gt;My task is handling differents domains with the same global logic so i don't want to split up the job in one task per domains.&lt;/P&gt;</description>
      <pubDate>Tue, 13 Aug 2024 16:52:12 GMT</pubDate>
      <guid>https://community.qlik.com/t5/Talend-Studio/TMC-Same-task-multiples-plans-differents-parameters/m-p/2476125#M141138</guid>
      <dc:creator>Grutt</dc:creator>
      <dc:date>2024-08-13T16:52:12Z</dc:date>
    </item>
    <item>
      <title>Re: TMC Same task, multiples plans, differents parameters</title>
      <link>https://community.qlik.com/t5/Talend-Studio/TMC-Same-task-multiples-plans-differents-parameters/m-p/2477150#M141161</link>
      <description>&lt;P&gt;Hello&lt;/P&gt;
&lt;P&gt;The same task can't be set with different parameter, as a workaround, duplicate the task and configure each of them with expected param, use these tasks in separate plans.&lt;/P&gt;
&lt;P&gt;Regards&lt;/P&gt;
&lt;P&gt;Shicong&lt;/P&gt;</description>
      <pubDate>Wed, 21 Aug 2024 05:08:07 GMT</pubDate>
      <guid>https://community.qlik.com/t5/Talend-Studio/TMC-Same-task-multiples-plans-differents-parameters/m-p/2477150#M141161</guid>
      <dc:creator>Shicong_Hong</dc:creator>
      <dc:date>2024-08-21T05:08:07Z</dc:date>
    </item>
  </channel>
</rss>

