<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: Parallel Execution in Talend Studio</title>
    <link>https://community.qlik.com/t5/Talend-Studio/Parallel-Execution/m-p/2239464#M27243</link>
    <description>&lt;P&gt;&lt;A href="https://community.qlik.com/s/profile/0053p000007LQWOAA4"&gt;@kbentama&lt;/A&gt;&amp;nbsp;, you can have a db table with execution sequence and can design with tParallelize&amp;nbsp; component for one flow you need to take&amp;nbsp;execution sequence =1 and other flow should be&amp;nbsp;execution sequence =2 ,like that you can design your job.&lt;/P&gt;</description>
    <pubDate>Wed, 06 Nov 2019 05:03:07 GMT</pubDate>
    <dc:creator>manodwhb</dc:creator>
    <dc:date>2019-11-06T05:03:07Z</dc:date>
    <item>
      <title>Parallel Execution</title>
      <link>https://community.qlik.com/t5/Talend-Studio/Parallel-Execution/m-p/2239463#M27242</link>
      <description>&lt;P&gt;Hi,&lt;/P&gt; 
&lt;P&gt;&amp;nbsp;&lt;/P&gt; 
&lt;P&gt;I am running a standard job with different parameter stored in excel or database.&lt;/P&gt; 
&lt;P&gt;I want to run that job in parallel with all different parameter.&lt;/P&gt; 
&lt;P&gt;&amp;nbsp;&lt;/P&gt; 
&lt;P&gt;Currently if i access parameter from database and run that job, its running in sequentially.&lt;/P&gt; 
&lt;P&gt;Other option is using tparallelize and hard code each parameter in that job instance separately (here it will work in parallel but too much manual work).&lt;/P&gt; 
&lt;P&gt;&amp;nbsp;&lt;/P&gt; 
&lt;P&gt;My question is, Is there any method where i can access the parameter from database and run the job with all parameters parallelly.&lt;/P&gt; 
&lt;P&gt;&amp;nbsp;&lt;/P&gt; 
&lt;P&gt;Regards,&lt;/P&gt; 
&lt;P&gt;rajkamal&lt;/P&gt;</description>
      <pubDate>Wed, 06 Nov 2019 01:33:33 GMT</pubDate>
      <guid>https://community.qlik.com/t5/Talend-Studio/Parallel-Execution/m-p/2239463#M27242</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2019-11-06T01:33:33Z</dc:date>
    </item>
    <item>
      <title>Re: Parallel Execution</title>
      <link>https://community.qlik.com/t5/Talend-Studio/Parallel-Execution/m-p/2239464#M27243</link>
      <description>&lt;P&gt;&lt;A href="https://community.qlik.com/s/profile/0053p000007LQWOAA4"&gt;@kbentama&lt;/A&gt;&amp;nbsp;, you can have a db table with execution sequence and can design with tParallelize&amp;nbsp; component for one flow you need to take&amp;nbsp;execution sequence =1 and other flow should be&amp;nbsp;execution sequence =2 ,like that you can design your job.&lt;/P&gt;</description>
      <pubDate>Wed, 06 Nov 2019 05:03:07 GMT</pubDate>
      <guid>https://community.qlik.com/t5/Talend-Studio/Parallel-Execution/m-p/2239464#M27243</guid>
      <dc:creator>manodwhb</dc:creator>
      <dc:date>2019-11-06T05:03:07Z</dc:date>
    </item>
  </channel>
</rss>

