<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Restoration in QlikView</title>
    <link>https://community.qlik.com/t5/QlikView/Restoration/m-p/172601#M42089</link>
    <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;I need sugesstions for the following:&lt;/P&gt;&lt;UL&gt;&lt;LI&gt;There are 3 flat files in a location from which I have to load my QVD.The files are monthly files and should be landed in the required location by 5th of each month. The re-load is scheduled for 6th. What if one of the files is not updated? For now I have built a script which will pick up the 'delta data' from the file and load it into the QVD. Now if a particular file is not updated it will run the reload process and load data for the other 2 file and do not do anything for the 'unchanged file'. Then I have alerts set up which will check if the data from a QVD is from the previous month then send an alert. But can this be handled before reloading? I mean can I send the alert from the script level where it finds that the max QVD date is equal to max of file date.&lt;/LI&gt;&lt;LI&gt;&lt;DIV&gt;Let say we have a field A which is used in one of my charts. Then after a 5 months our Data base guys changed logic to store that information in another field B. So there is a chance that we have already loaded that into Qlikview for 6 months. Now how do I go back to a previous month and reload again? I can think of deleting the QVD and then restarting from 1st month...then pausing after5th month and then changing code for the 6th month and continue reloading. But is there a better option for this? Something like a restoration point in Qlikview?&lt;/DIV&gt;&lt;/LI&gt;&lt;/UL&gt;&lt;P&gt;Thanks in advance!!&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
    <pubDate>Thu, 04 Nov 2010 21:36:17 GMT</pubDate>
    <dc:creator>parpatra</dc:creator>
    <dc:date>2010-11-04T21:36:17Z</dc:date>
    <item>
      <title>Restoration</title>
      <link>https://community.qlik.com/t5/QlikView/Restoration/m-p/172601#M42089</link>
      <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;I need sugesstions for the following:&lt;/P&gt;&lt;UL&gt;&lt;LI&gt;There are 3 flat files in a location from which I have to load my QVD.The files are monthly files and should be landed in the required location by 5th of each month. The re-load is scheduled for 6th. What if one of the files is not updated? For now I have built a script which will pick up the 'delta data' from the file and load it into the QVD. Now if a particular file is not updated it will run the reload process and load data for the other 2 file and do not do anything for the 'unchanged file'. Then I have alerts set up which will check if the data from a QVD is from the previous month then send an alert. But can this be handled before reloading? I mean can I send the alert from the script level where it finds that the max QVD date is equal to max of file date.&lt;/LI&gt;&lt;LI&gt;&lt;DIV&gt;Let say we have a field A which is used in one of my charts. Then after a 5 months our Data base guys changed logic to store that information in another field B. So there is a chance that we have already loaded that into Qlikview for 6 months. Now how do I go back to a previous month and reload again? I can think of deleting the QVD and then restarting from 1st month...then pausing after5th month and then changing code for the 6th month and continue reloading. But is there a better option for this? Something like a restoration point in Qlikview?&lt;/DIV&gt;&lt;/LI&gt;&lt;/UL&gt;&lt;P&gt;Thanks in advance!!&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
      <pubDate>Thu, 04 Nov 2010 21:36:17 GMT</pubDate>
      <guid>https://community.qlik.com/t5/QlikView/Restoration/m-p/172601#M42089</guid>
      <dc:creator>parpatra</dc:creator>
      <dc:date>2010-11-04T21:36:17Z</dc:date>
    </item>
  </channel>
</rss>

