<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Loading information into QV from excel in QlikView</title>
    <link>https://community.qlik.com/t5/QlikView/Loading-information-into-QV-from-excel/m-p/981184#M949781</link>
    <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;&lt;BR /&gt;Hi All&lt;/P&gt;&lt;P&gt;So I lost the argument and instead of being able to load from the source database, I am being asked to use the attached spreadsheet to load into QlikView. I need to load it in such a way as to end up with data items Area, department, team, year, month, Abs (Fte), Avail (FTE), Abscence %, Abscence Estimated Cost - any ideas? The spreadsheet looks like this:&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Cheers,&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Ella&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
    <pubDate>Wed, 09 Dec 2015 13:59:30 GMT</pubDate>
    <dc:creator />
    <dc:date>2015-12-09T13:59:30Z</dc:date>
    <item>
      <title>Loading information into QV from excel</title>
      <link>https://community.qlik.com/t5/QlikView/Loading-information-into-QV-from-excel/m-p/981184#M949781</link>
      <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;&lt;BR /&gt;Hi All&lt;/P&gt;&lt;P&gt;So I lost the argument and instead of being able to load from the source database, I am being asked to use the attached spreadsheet to load into QlikView. I need to load it in such a way as to end up with data items Area, department, team, year, month, Abs (Fte), Avail (FTE), Abscence %, Abscence Estimated Cost - any ideas? The spreadsheet looks like this:&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Cheers,&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Ella&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
      <pubDate>Wed, 09 Dec 2015 13:59:30 GMT</pubDate>
      <guid>https://community.qlik.com/t5/QlikView/Loading-information-into-QV-from-excel/m-p/981184#M949781</guid>
      <dc:creator />
      <dc:date>2015-12-09T13:59:30Z</dc:date>
    </item>
  </channel>
</rss>

