Prevent AutoCalendar from running in Qlik Sense

Is there a way to prevent the auto calendar from running every time you Load data from the Data Editor?

It creates a slew of columns i don't need.

Thanks

1 Reply
DKK
Contributor III
Contributor III

Hi

Try to comment out  the Auto calendar section and reload the data in Data Load Editor. It should be fine then