Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
Hello,
Qlik sense has swap month with day.
2018/11/02 is YYYY/MM/DD (2nd November 2018). However, Qlik Sense interpreted it as 2018/02/11 YYYY/MM/DD (11th February 2018).
How can I change this to the correct dates?
Many thanks
Hi,
Check Date format in Main section in Data load editor. Also, try to format the date when you read. For E.g.
Month(Date(Floor( Date(DATE_FIELD)),'YYYY/DD/MM'))
I have tried changing the DataFormat but it's not working.
I tried with Month(Date(Floor( Date(Hora e Data)),'YYYY/DD/MM'))
and also Date(Date#([Hora e Data], 'YYYY/MM/DD'), 'MM/DD/YYYY')
and Date([Hora e Data], 'YYYY/MM/DD')
and Date#([Hora e Data], 'YYYY/MM/DD')
but I don't really understand DateFormat
All formats I have tried don't change a thing
The thing is, I don't want to change the format of the Date, I just want to change the way Qlik Sense interprets the Dates.
the auto generated code shows that it is swapping Month with Day