Hello expert
I have 3 qvw.(A,B and C)
C sets a EDX trigger that A and B reload successfully will run.
A. will trigger C about 10:03 AM.
-> C start to run util 11:38 AM.(at the same time,B will trigger C when 10:31 AM.,but C is running)
I meet a strange situation that C will be trigger when 1:29 PM.
I doubt it maybe cause by B?
When B trigger C, it is running. B will wait for C ?
But it is also strange,
In this assumptions,C should trigger by B when 11:38(C first end time).
So my question is
why C run when 1:29 AM,it maybe caused by B or?
By the way,C reload Duration about 1h 35mins.
Thanks.
Amy