Ive created a gannt chart with a task list on the Y axis and time on the X as youd expect.
the gannt chart was produed in MS project then exported into excel with 3 colums
1)W.B.S no
2)Task Name
3) Duration
what I want is basically the WBS no to go on the Y axis as well as the task name. having one or the other results in the table being exactly the same on the labels on the Y change as youd expect but not what Im after.
can anyone help?
Hi Samuel
perhaps this can help you?
http://community.qlik.com/blogs/qlikviewdesignblog/2012/06/01/recipe-for-gantt-chart
If not you can post the .qvw?
Regards
Thanks for the post but unfortunatly not. the link takes me up to the point im at now. I can post the qvw however im a free user so cant open what U change but here it is for you to see what i mean.
like i said in the source excel there is a unique wbs for each task therefore the duration is the same for both the wbs and duration.