saivina2920
Contributor

How to calculate overdue from specific date and show in pie and table chart

I want to calculate overdue from specific date. I want to show this result in Table Chart and pie chart

i have mentioned different overdue in attached excel. 

I have no idea how to proceed the overdue calculations.

pls. find attached excel and let me know if you have any doubts.

pls. help this is urgent and i am waiting for long time.

Note :  KEY column is "Received Date" for process the formula

Labels (2)
2 Solutions

Accepted Solutions
parthesh
Contributor

Re: How to calculate overdue from specific date and show in pie and table chart

Please find attached QVW, i think it will be fine now.

let know in case of any issue concern.

 

Regards,

Parthesh.

View solution in original post

parthesh
Contributor

Re: How to calculate overdue from specific date and show in pie and table chart

You can try
=count(DISTINCT if((Date(NewDate,'dd-mm-yyyy')+GetFieldSelections(SeqDays) - Today() > -5 and Date(NewDate,'dd-mm-yyyy')+GetFieldSelections(SeqDays) - Today() < 0) and (EMP_SECTION like '*B-*' or EMP_SECTION like '*C-*'),NewDate))

View solution in original post

15 Replies
parthesh
Contributor

Re: How to calculate overdue from specific date and show in pie and table chart

Hello,

Please check attached QVW, i have modified QVW which you have attached in post.

hope it will help, Let me if you are not looking for this.

 

Regards,

Parthesh.

saivina2920
Contributor

Re: How to calculate overdue from specific date and show in pie and table chart

Its awesome and this my requirements
I have modified few points in QVW file. find attached.
I have few doubts below.
1. Instead of 5 difference, i have added list box. so that end user can select dynamic value. pls. check the count and confirm.
2. In table box, i just want to hide 3 columns (donot delete). i want to display only <5, 100 to 20 days and >20 Days column is enough.
3. Instead of column (1) and column(2), can we specify the field name.?
4. In the table box, on top of that we need total count for all the 3 conditions (<5 days, 10 to 20 days, > 20 days) instead of zero.
5. both table chart count and pie chart count should match always for all 3 conditions (<5 days, 10 to 20 days, > 20 days).
If the above is through, then we achieved.

pls. let me know if you need any more doubts.

saivina2920
Contributor

Re: How to calculate overdue from specific date and show in pie and table chart

Any update pls...
saivina2920
Contributor

Re: How to calculate overdue from specific date and show in pie and table chart

1. both table chart count and pie chart count should match always for all 3 conditions (<5 days, 10 to 20 days, > 20 days).
2. Instead of using 5 is the difference, i have added list box. so that end user can select dynamic value. pls. check the count and confirm.
3. In table box, i just want to hide 3 columns (donot delete). i want to display only <5, 100 to 20 days and >20 Days column is enough.
4. Instead of column (1) and column(2), can we specify the field name.?
5. In the table box, on top of that we need total count for all the 3 conditions (<5 days, 10 to 20 days, > 20 days) instead of zero.

pls. respond immediately.

atleast point no. 1, 2 and 4 is most important. i tried, but, i am not able to get the exact values.

For < days,
both Pie and Table values showing different number..???????
pls. find updated file as attached.

saivina2920
Contributor

Re: How to calculate overdue from specific date and show in pie and table chart

Dear Parthesh,
Can you pls. check my comments..?
I am waiting and this is urgent..
parthesh
Contributor

Re: How to calculate overdue from specific date and show in pie and table chart

Give me 1- 2 hours I will get back to you.
saivina2920
Contributor

Re: How to calculate overdue from specific date and show in pie and table chart

Thanks.
I am waiting. I have enclosed one more screenshot for your reference.

All the counts should be match both table and pie chart. (all 3 conditions (< days, 10 to 20 days and >20 days).

Thanks for your excellent support.

parthesh
Contributor

Re: How to calculate overdue from specific date and show in pie and table chart

Please find attached QVW, i think it will be fine now.

let know in case of any issue concern.

 

Regards,

Parthesh.

View solution in original post

saivina2920
Contributor

Re: How to calculate overdue from specific date and show in pie and table chart

Really you rock parthesh..Thanks for your marvellous support. It's working now....kuddoooos!.......
i have one small doubt.
instead of using the lengthy formula, can we use variable and assign those variable in to formula...?
for example,
=count(DISTINCT if(Date(NewDate,'dd-mm-yyyy')+GetFieldSelections(SeqDays) - Today() > -5 and Date(NewDate,'dd-mm-yyyy')+GetFieldSelections(SeqDays) - Today() < 0,NewDate))

var 1 = Date(NewDate,'dd-mm-yyyy')+GetFieldSelections(SeqDays) - Today()
var 2 = Date(NewDate,'dd-mm-yyyy')+GetFieldSelections(SeqDays) - Today()
Will it work...?
reply when you are free....
Thanks again.!!!!!