Dear Friends
I have created a combo chart which is adding cumulative savings based on project end date.
The chart look like:
For every qtr I have added the target reference line on y axis.
However, I need to add the Quater target as a line graph instead of reference line.
Q1 = Q1 Target
Q2 = Q1 + Q2 Target
Q3 = Q1+ Q2+ Q3 Target
Q4= Q1+ Q2+ Q3 + Q4 Target
How to add another dimension where I can plot line graph based on specific date?
Please share some examples.
Thanks!
Rahul
i think in exoression tab for that particular expression tick on radio button of full accumulate
Please post an example document with sample data and an example of what the result chart should look like.