Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
Is it possible to schedule a reload of a qvw every Monday week2 of each month on QMC?
I think you should be able to achieve that by selecting the below:
With a publisher it might be possible but only with the server you will need create such check-logic within the beginning of the qvw and run the qvw on a daily bases:
if CheckLogic = false then
exit script;
end if
- Marcus
it is possible
This would be perfect, but we work using 4-4-5 weeks and the monday desired is not always the second month in the month, so for example I would like to load the qvw 9 days after the last date of our specified monthend date.
7/09/2015, 12/10/2015,9/11/2015 and 14/12/2015.
hope this makes sense?
Then you might need to use an approach like my suggestion from above with using from specialized master-calendar. This example didn't use 4-4-5 else 4-5-4 but I think it could be adapted: 4-5-4 Master Calendar.
- Marcus
I do not get the options you show I have these options
The screenshot from myself is coming from publisher, yours - from QV server, that's why they are different. In that case you should follow the advices given by Marcus_Sommer