Skip to main content
Announcements
Qlik Connect 2024! Seize endless possibilities! LEARN MORE
cancel
Showing results for 
Search instead for 
Did you mean: 
Yassine_Gh
Contributor
Contributor

build a path from arc

Hello,
I have an arc table containing id, start, end, travel_time see the example attached.
I want to calculate the sum of the travel_times from several selected arc such as Path = start of the next arc = end of the previous arc.
-> Have multiple ARC filter
-> calculate in a graph from several selections.

Thanks for your help

0 Replies