Skip to main content
cancel
Showing results for 
Search instead for 
Did you mean: 
Philip12
Contributor
Contributor

Integrating Outlook calendar with Qlik to determine resource loading

Hi, We're currently using a tool called Resource Guru to manage resources across various projects. resources are loaded in RG and this creates a read only entry into the resource's outlook calendar.

We want to go the other way, resources populate their outlook calendars with project timelines and tasks, etc. and have this be read by a Qlik report to determine resource loading over time, at any point in time, for any period in time, etc.

Has this been done, can it be done? Any help or suggestions or reference to material that could help would be appreciated. Thanks.

Labels (5)
0 Replies