Is it possible to get a count of the non working days between two dates using version 8.5 using a chart?
A non working day consists of a Sunday or a list of dates in a config file. I am able to load the config file into Qlikview ok.
I have the max of one date (based on a list of criteria) and the max of another (based on a separate list of criteria) and from these dates I need to the count of non working days.
This needs to be done at a chart level as the date range been selected is dynamic.
Thanks,
Kevin.
Try using NetWorkDays Formula.
But as far I know it takes sat, sunday as holidays , in that case will need to write a function in database to calculate the working days.
Regards
Amar![]()
Hi,
are you want to count sundays and holidays between two given dates ?..
If so then you can use Week function to count non working days.