Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
Hi All,
While performance testing with JMeter can we measure the calculation time of the chart?
We are looking at improving the calculation time and be able to compare the original time taken as well as the time taken after optimization.
thanks,
Rajesh Vaswani
Hi,
did you came across these setting.
Sheet Properties --> Object tab --> Calculation time column.
Regards
ASHFAQ
Hi Ashfaq,
I came across this.
I want to test this in the simulated manner from Ajax.
From request send to response received and each chart object fully loaded and time completed.
Could you comment on, "can JMeter differentiate if the chart object has fully loaded?"
thanks,
Rajesh Vaswani
I'm assuming you're using the QVScalabilityTool for JMeter testing.
You won't be able to measure that with JMeter as it's using an top-down approach to measure the response times. This means the response time you'll get with JMeter is the time the whole page need to calculate & display, which ultimately is also what the user experiences.
There are ways to call a specific chart object in an URL and measure this but this requires a modification of the original testing tool (Tool for easy creation of load/performance tests of QlikView (v.10 and 11) that is).