Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
how to connect master calender with two date fields.
Hi..
Kindly elaborate your query. What type of Date fields you have..
i have two table ,one give date wise expenses and another table give joining date of an employee and i need both these date to be linked with master calendar
Rename both the date fields with the same name and Concatenate them and after that Link it with the Master Calendar's date field.
For Ex:
A:
Date1 as [Link Date]
Concatenate
B:
Date2 as [Link Date]
Master Calendar:
Date as [Link Date]