Skip to main content
cancel
Showing results for 
Search instead for 
Did you mean: 
sathish_kumar
Contributor II
Contributor II

Offset date value to calculate demand for subproduct using demand from product and lead time

Hello Team,

I am trying to create qlikview PoC for my college to show how demand from product A flows to its subproduct A1/A3 using lead time and BOM.

I have created an excel sheet showing input  sheet for demand table for Product and using lead time and BOM qty, i am calculating demand for subproduct A1 in output sheet.

Is there any scope to write the same in the load script? should i use below function to see values  or any idea to arrive at desired output?

0 Replies