Partial count is not coming proper

Hi

I am trying to get correct right generation data in my project.the total sum of generation is coming right but when i am selecting single state in my project as dimension than the generation is coming wrong.

this is total installed capacity which is coming right (fig.1)

but in (fig2) when i am select single state like AP then the installed capacity is not coming right .instead of giving 222.63

it will give 279

the expression used is::SUM(CapacityPerEquipment) / 1000

please help me out .

thanx in advance.

5 Replies
sunny_talwar

Would you be able to share your app to look into it?

Anil_Babu_Samineni

May be State AP has that values only?

Best Anil, When applicable please mark the correct/appropriate replies as "solution" (you can mark up to 3 "solutions". Please LIKE threads if the provided solution is helpful
Anonymous
Not applicable
Author

No

when i am performing same task with pivot table than it will give me right result .

as Ap-279 and 222.63

Anonymous
Not applicable
Author

The size of application is too large.

i want to know that when i am perfoming same task with pivot chart the result is coming right but when it is performed with gauge chart then it is giving me wrong ans .

for Eg:

Pivot chart:

selecting state AP it gives 279 and 222.63

but in gauge chart for AP it gives 279 and 276

expression was same for both chart:::   SUM({<IsAvailable={1}>}CapacityPerEquipment)/1000

sunny_talwar

May be this link can help you address the size concerns

Preparing examples for Upload - Reduction and Data Scrambling