I’ve done something similar before with Pronto data and linked it to maintenance logs by work order IDs. If you’re planning to switch to Cloud ERP in the future, just be ready for changes in table names and formats. I had to tweak some of my existing loads after our shift, especially with how the equipment history tables were structured.