Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
Hi,
- I have a bar chart with dimension BC(group). In group the fields are BC1 and BC2
- I taken one slider with two variables vMin and vMax.
When i'm changing the slider based on the range the bar chart changing. Now my task is first i'll select BC1 in bar chart and changed the range in the slider. After that I'll select BC2 and change the range in the slider. Again i'll select BC1 at that time the slider range should be same as previously first time i select BC1 range.
Hi,
Can you please upload QVW file
Thanks
Kaushik Solanki
Hi,
i'm not able find upload file button in new version of qlikview. How can i upload the file in new version can you help me.
Got to Reply and in the upper right corner you have the "Use advanced editor", which allows to upload files
Peter
Can you plz check the enclosed file
Thanks a lot...Prieper
Hi,
You can have 4 varibales for each of the group member.
In your example youhave only two. Use min and max for both the group members.
Regards,
Kaushik Solanki