We are currently using the SAPConnector to extract data from our ECC production environment without issue. We have added a new development environment and our extracts are failing to complete. Below is a section of a recent log file and the failure message we are receiving. I have tried increasing the Memory Buffer settings and the TimeOutBatch, TimeOutFetch and TimeOutStartBatch parameters but the failures still occur.

Any help is appreciated!

2012-10-09 10:43:44        Progress              OpenStream invoked. Jobnumber is 20121009144344

2012-10-09 10:43:44        Progress              Jobnumber is 20121009144344

2012-10-09 10:43:44        Progress              Calling FetchStream

2012-10-09 10:43:44        Progress              Reply from FetchStream received

2012-10-09 10:43:44        Error      Fetch aborted, due to an unexpected exception. Key = JOB_CANCELLED (ID:00 Type:E Number:001 Job aborted, check log for Job /QTQVC/READ_DATA in Job Overview (transaction SM37))

Thanks,

Dan Baksa

1 Solution

Accepted Solutions
dbaksa_1
Not applicable

Re: SAPConnector Failure

This problem has been solved.The log file pointed our Basis team to an SAP log entry that indicated the environment was running out of buffer space. Our basis team adjusted several parameters in the development environment to match production and the problem has been solved.

2 Replies
dbaksa_1
Not applicable

Re: SAPConnector Failure

This problem has been solved.The log file pointed our Basis team to an SAP log entry that indicated the environment was running out of buffer space. Our basis team adjusted several parameters in the development environment to match production and the problem has been solved.