I need to create a seamless Time Dimension, based on Start Time

2014-03-03_1448.png

Hi All,

The above chart is a pivot table, The background color changes based on the task being performed

The times at the top are the start times of the task.

My question is how can I get a more seamless chart, basically I would like the chart to always have the 24 hours in a day but with the tasks colored where it fits in with the time of the day.

I hope that makes sense.

Regards

Alan

13 Replies
Not applicable

rustyfishbones
Master II
Master II
Author

This may explain it better,

2014-03-03_1503.png

you can see from this sample data that user JOS was picking between 8 am and 9 am, but it is not represented correctly in the chart from the original post, you can see it's green for picking but only for the start time until the start time of the next task, but I need it colored from 8 to 9, like the below mock-up

2014-03-03_1506_001.png

I hope that clears up what I am trying to do

Regards

Alan

rustyfishbones
Master II
Master II
Author

Hi All,

Should I be using a different chart type to achieve this?

Not applicable

Alan,

Thomas is certainly right. That is perhaps the same problematic as a master calendar, but with time in a day.

Many times, the problematic is that we get an event between two dates, and this event must be "applied" to a single date (how many clients, contracts do I have a given day). Therefore, I would say:

1) create a dimension with a given time elapse : every 15 or 30 minutes

2) relate each event to this dimension (you will duplicate some lines)

3) do the chart (I did not understand the different colors, so, will you need also to split the numbers ?)

Fabrice

rustyfishbones
Master II
Master II
Author

Hi,

How do I create 1 minute Intervals and link them to the Start Time and End Time?

Still not sure sorry!

Regards

Alan

hic
Former Employee
Former Employee

You can use a While loop and create reference minutes, very much the same as described in http://community.qlik.com/blogs/qlikviewdesignblog/2013/02/12/reference-dates

HIC

hic
Former Employee
Former Employee

Something along the following:

Load *,

  Time(IntMinute/24/60) as Minute;

Load *,

  StartTime_IntMin + IterNo()-1 as IntMinute

  While IterNo() <= FinishTime_IntMin - StartTime_IntMin + 1 ;

Load

   Floor(24*60*[Start Time]) as StartTime_IntMin,

   Floor(24*60*[Finish Time]) as FinishTime_IntMin

   From xxx ;

where all the fields containing 'IntMin' are integer minutes.

You would need additional code to handle intervals spanning over midnight though...

HIC

Not applicable

  Alan,

Assuming StrtTime and EndTime are valid time stamps:

Data2:
LOAD ID, Start,
Timestamp(Start+IterNo()/(60*24), 'hh:mm') as NewStart,
EndTime
Resident Data

While Start+IterNo()/(60*24) <= EndTime

;

IterNo() is a function starting at 1. You can IterNo()-1 to start at 0.

A day is between 0 and 1: 0,5 is 12:00. Therefore, 1 minute is 1/60*24

The loop is done until we reach the upper bound (here End Time)

Fabrice

rustyfishbones
Master II
Master II
Author

Thanks Henric,

I will try this and get back to you

Regards

Alan