Skip to main content
Announcements
Live today at 11 AM ET. Get your questions about Qlik Connect answered, or just listen in. SIGN UP NOW
cancel
Showing results for 
Search instead for 
Did you mean: 
mbespartochnyy
Creator III
Creator III

Reference line for a Dimension

Hello community,

I'm working on a simple chart that displays seasonal average prices for an index. My dimension is a date field and expression is an average of bid and offer values. I would like to have a reference line on a chart to show when each ear starts.

For example, attached is the sample app with charts that I would like to have. The only addition that I would like to make to the chart is have a vertical reference line showing up on January 3, 2017, January 4, 2016, January 1, 2015 etc.

Does anyone know of a way to get that reference line on the chart?

Thanks in advance,

Mikhail Bespartochnyy

1 Solution

Accepted Solutions
sunny_talwar

The vertical reference line is only possible when you have continuous axis. Will something like this work for you?

Capture.PNG

View solution in original post

7 Replies
sunny_talwar

The vertical reference line is only possible when you have continuous axis. Will something like this work for you?

Capture.PNG

mbespartochnyy
Creator III
Creator III
Author

That's exactly what I was looking for! Thanks, Sunny!

Do you know if there's a way to have the Enable X-Axis Scrollbar working with continuous axis option enabled?

Mikhail B.

sunny_talwar

I don't think it is possible, but I can check

sunny_talwar

Don't think this is possible

flipside
Partner - Specialist II
Partner - Specialist II

As an alternative to Sunny's suggestion, you could add a second expression like this ...

=if(Deal_Date='1/4/2016',Dual('-----------------------------------------------------------------------------------------------',0.01),'')

... tick the Values On Data Points option and set labels to display vertically (on the Presentation tab). It will only display when there's a reduced number of data points but it might work for you. Bit of a hack, though. And I haven't tested it through Accesspoint either.

I'd also look at options such as setting the line color and line styles to alternate between periods. Also, you could change to a combo chart and have an alternating background color (essentially a static bar value which changes to alternating shades at the require date points - just set the Bar and Cluster distances to zeroes).

flipside

mbespartochnyy
Creator III
Creator III
Author

Thanks for looking into it, Sunny! I ended up simply enabling the continuous x-axis. Didn't get any complains yet.

sunny_talwar

That's awesome