Qlik Community

QlikView Scripting

Discussion Board for collaboration on QlikView Scripting.

Announcements

Breathe easy -- you now have more time to plan your next steps with Qlik!
QlikView 11.2 Extended Support is now valid through December 31, 2020. Click here for more information.

Not applicable

How to Change Report Layout(Chart Type) Run Time in Drill Down Group?

hello Dear,

I created a group of Dimension (year / Semester / Quarter / Month / Day) In Dimension Tab.

202.png

My Report Look Like :

Root Chart :

100.png

After Click On Year :

Show Report Per Semester Look Like

But This Phase ,I want Show Pie Chart Instead Of Bar Chart

101.png

But I'd then click chart type is changed (Change To PIE Chart)

I would like with every click chart type is changed

1 Solution

Accepted Solutions
Gysbert_Wassenaar
Not applicable

Re: How to Change Report Layout(Chart Type) Run Time in Drill Down Group?

See attached example.


talk is cheap, supply exceeds demand
4 Replies
Gysbert_Wassenaar
Not applicable

Re: How to Change Report Layout(Chart Type) Run Time in Drill Down Group?

That's not possible. But you can use two different charts and show/hide the correct one using a conditional display expression (on the Layout tab of the charts properties window) that uses the GetCurrentField function to check which field from the drill-down group is active.


talk is cheap, supply exceeds demand
Not applicable

Re: How to Change Report Layout(Chart Type) Run Time in Drill Down Group?

Thanks Gysbert Wassenaar

Do You Have Sample GetCurrentField  And Change Chart Per Group.?

Gysbert_Wassenaar
Not applicable

Re: How to Change Report Layout(Chart Type) Run Time in Drill Down Group?

See attached example.


talk is cheap, supply exceeds demand
Not applicable

Re: How to Change Report Layout(Chart Type) Run Time in Drill Down Group?

Thanks