      Scenario:

       

      I have a chain of tasks that are dependent on each other. In other words, a document reloads on the event of a successful reload of the previous document. The entire chain of tasks runs daily at midnight. I want the last document in the chain to be dependent on the previous task BUT run only on Mondays. The rest of the chain would continue to run daily as normal.

       

      I can probably figure something out with partial reloads and put an if statement in the script of the document to check if the system date is a Monday, but I was hoping there would be some kind of setting in the publisher that would allow me to run a task on the success of another task AND a schedule.

       

      Thanks in advance!