    Networks days during the load

      I have to calculate past 2 working days.

       

      I have date field -createddate

      07/30/2015

      07/31/2015

      07/25/2015

      07/24/2015

       

      How to calculate past 2 working days during the load.

       

      I tried network days-doesn't work.

       

      I can avoid Saturday and Sunday.