3 Replies Latest reply: Aug 17, 2016 9:48 AM by suhas h RSS

    How to disable the subsequent tasks in a scheduled job if the reload task fails

    Tripti Gupta

      I have a scheduled job which runs at 10:00am daily. It first refreshed the data, loads the recipients, generates and distributes the report to the recipients.

      When the refresh data (reload of qvw used as source for the report) fails, I want the subsequent steps of load of recipients, generation and distribution of reports should not be done.