3 Replies Latest reply: Jan 3, 2017 7:38 AM by Yiannis Charalambous RSS

    Qlikview variables get things very slow

    Yiannis Charalambous

      I am currently facing a very slow performance in Qlikview and I was wondering whether you can give me an insight as to why this is happening.

      Basically I am trying to present projected values for 20 periods and each period depends on the previous period so I feed the previous period’s result in the new period.

      When I add period 5 in a chart (still have 15 periods to add) it gets very slow and I was wondering if there is something wrong with using nested variables.