Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
Hi Every one,
Can you please send me if you have any Check list document for go-live in Qliksense.
Thanks and regards,
Naresh.M
Hi,
Make sure below item done for pre-production roll-out checklist
1) after UAT sign off try to migrate the report/app from UAT to production environment
(after migrate make sure the db DSN connection config, ensure file path and data availability etc)
2) if you have section/sheet level access configured, then make sure all users added into prod and verify the data/object level access based on different user role and ensure all users have right access)
3) make sure the data (qvd/excel/falt source) availability based on the report scheduled frequency (daily/weekly/monthly scheduled via QMC)
4) ensure all the 3rd party extension imported and tested fully.
5) prepare some user document/guide for the users and u can include this doc in your roll-out email
fyi, below document based on qlikview (u can use this check-list in addition u need to add the extension content)
QlikView Development and Deployment Checklist template
Checklist for migrating Dashboard to Production
Thanks
Deva