7 Replies Latest reply: Sep 5, 2011 10:02 AM by mdkbayern2011 RSS

    Pie Chart based on more than one field

      Hi there,

       

      I'm trying to draw a pie chart but the dimension I want is actually a list of fields and I want these 15 fields each as a segment of the pie not as a pie within a pie.

       

      The fields I want as sectors are:

      ([COST_NURSING])

      ([COST_CONSULTANTS])

      ([COST_OTHERCLINICALPAY])

      ([COST_NONCLINICALPAY])

      ([COST_DRUGS])

      ([COST_CLINICALSUPPLIES])

      ([COST_OTHERDIRECTCOSTS])

      ([COST_ALLIEDHEALTHPROFESSIONALS])

      ([COST_RADIOLOGY])

      ([COST_PATHOLOGY])

      ([COST_THEATRECOSTS

      ([COST_OTHERSERVICES])

      ([COST_PROSTHETICS])

      ([COST_HOTELSERVICES])

      ([COST_PHARMACY])

       

      In the Expression I have "Cost Breakdown" define as a calculated expression as:

      (SUM([COST_NURSING])+SUM([COST_CONSULTANTS])+SUM([COST_OTHERCLINICALPAY])+SUM([COST_NONCLINICALPAY])

      +SUM([COST_DRUGS])+SUM([COST_CLINICALSUPPLIES])+SUM([COST_OTHERDIRECTCOSTS])+SUM([COST_ALLIEDHEALTHPROFESSIONALS])+SUM([COST_RADIOLOGY])+SUM([COST_PATHOLOGY])

      +SUM([COST_THEATRECOSTS])+SUM([COST_OTHERSERVICES])+SUM([COST_PROSTHETICS])+SUM([COST_HOTELSERVICES])+SUM([COST_PHARMACY]))

       

      I made an group of the fields called "OperationalCosts" but this didn't work as a dimension either.

       

      Can anyone please suggest a solution to my simple pie chart requirement.

       

      Thanks

        • Pie Chart based on more than one field
          Or Shoham

          Sounds like you need to set up a crosstable load for this (there may be other ways, but that seems like the easiest thing to do). For details on how crosstable loads work, see the QV reference manual (page 484 in the QV10 manual) - if you can't get that to work, post here and I'll try and help out.

            • Re: Pie Chart based on more than one field

              Ich werde ab  05.09.2011 nicht im Büro sein. Ich kehre zurück am

              23.09.2011.

               

              Ich werde Ihre Nachrichten nach meiner Rückkehr beantworten.

               

               

               

              Diese E-Mail kann Betriebs- oder Geschäftsgeheimnisse oder sonstige vertrauliche Informationen enthalten. Sollten Sie diese E-Mail irrtümlich erhalten haben, ist Ihnen eine Verwertung des Inhalts, eine Vervielfältigung oder Weitergabe der E-Mail ausdrücklich untersagt.

              Bitte benachrichtigen Sie uns und vernichten Sie die empfangene E-Mail. Vielen Dank!

            • Pie Chart based on more than one field

              Try this:

               

              Don't give any dimension.

               

              In Expression:

              1st Expression:

              =Sum([COST_NURSING])

               

              2nd Expression:

              =Sum(COST_CONSULTANTS)

               

              3 Expression:

              ..........................and so on.

               

              In this way define all ur expressions separately.

              Hope u get what u want.

                • Pie Chart based on more than one field

                  Thank you - just what I needed.

                    • Re: Pie Chart based on more than one field

                      Ich werde ab  05.09.2011 nicht im Büro sein. Ich kehre zurück am

                      23.09.2011.

                       

                      Ich werde Ihre Nachrichten nach meiner Rückkehr beantworten.

                       

                       

                       

                      Diese E-Mail kann Betriebs- oder Geschäftsgeheimnisse oder sonstige vertrauliche Informationen enthalten. Sollten Sie diese E-Mail irrtümlich erhalten haben, ist Ihnen eine Verwertung des Inhalts, eine Vervielfältigung oder Weitergabe der E-Mail ausdrücklich untersagt.

                      Bitte benachrichtigen Sie uns und vernichten Sie die empfangene E-Mail. Vielen Dank!

                    • Re: Pie Chart based on more than one field

                      Ich werde ab  05.09.2011 nicht im Büro sein. Ich kehre zurück am

                      23.09.2011.

                       

                      Ich werde Ihre Nachrichten nach meiner Rückkehr beantworten.

                       

                       

                       

                      Diese E-Mail kann Betriebs- oder Geschäftsgeheimnisse oder sonstige vertrauliche Informationen enthalten. Sollten Sie diese E-Mail irrtümlich erhalten haben, ist Ihnen eine Verwertung des Inhalts, eine Vervielfältigung oder Weitergabe der E-Mail ausdrücklich untersagt.

                      Bitte benachrichtigen Sie uns und vernichten Sie die empfangene E-Mail. Vielen Dank!

                    • Re: Pie Chart based on more than one field

                      Ich werde ab  05.09.2011 nicht im Büro sein. Ich kehre zurück am

                      23.09.2011.

                       

                      Ich werde Ihre Nachrichten nach meiner Rückkehr beantworten.

                       

                       

                       

                      Diese E-Mail kann Betriebs- oder Geschäftsgeheimnisse oder sonstige vertrauliche Informationen enthalten. Sollten Sie diese E-Mail irrtümlich erhalten haben, ist Ihnen eine Verwertung des Inhalts, eine Vervielfältigung oder Weitergabe der E-Mail ausdrücklich untersagt.

                      Bitte benachrichtigen Sie uns und vernichten Sie die empfangene E-Mail. Vielen Dank!