1 Reply Latest reply: May 7, 2012 8:55 PM by luistarzia RSS

    Sorry but i lost that Jhon Locke in the island !!!

      Helo and sorry but i cant write a expression with a calculated dimension and unknow the sintax,i intent with various sintax and nothing.

      The dimension calculated is

      = if(Año = 2012,'Actual','Anterior')

      and i need sum a value of ventas based in the dimension

      for example i write

      sum({<año=>} ventas) and work but and that is the question

      How i write the expression with the calculated dimension in the place of <año> ???

      Thanks in advance.