What is the best practice for testing a TAC cluster.
We have extended our Talend environment.
Old environment: 1x TAC, 3x ESB (cluster), 2x job server (cluster).
The TAC DB was also on top of the TAC.
New environment: 2x TAC (cluster), separately 2x TAC DB (master, slave), 3 ESB (cluster), 2 job servers (cluster).
Is there a recommended procedure to test the new environment especially the new TAC and TAC DB configuration with the old setup of ESB and Job Server?
Thanks and best regards