Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
I have one dimension date and 3 measures demand last week, ship qty, demand this week. I would like to show the data this way : Measure 1 as a bar, Measure 2 & 3 stacked.
I was able to achieve this using a combo chart. M1, M2 and M3 are set to Bar.
in the Presentation, turn on Stacked. Assign M2 + M3 as stack group. M1 is on its own.
I was able to achieve this using a combo chart. M1, M2 and M3 are set to Bar.
in the Presentation, turn on Stacked. Assign M2 + M3 as stack group. M1 is on its own.