Skip to main content
Announcements
Join us at Qlik Connect for 3 magical days of learning, networking,and inspiration! REGISTER TODAY and save!
cancel
Showing results for 
Search instead for 
Did you mean: 
AparnaRS
Contributor
Contributor

Need to create a line chart with actual vs. planned date on the calendar date

I want  to create a line chart in the Qlik Sense.

Where calendar Date(This is from Master Calendar) is on the x axis as a dimension and want 2 measures as No. of Parts for the Actual date(Fact Table) Vs. No. of Parts for the Planned date(Fact Table).

How should I achieve this with Set analysis?

Labels (1)
0 Replies