Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
Suddenly the progress of a run is not displayed anymore in Talend Open Studio for Data Integration (version 7.2.1). I mean the realtime progress that displays the number of rows being processed etc
I've restored the default windows preferences (Windows > preferences > restore defaults), unfortunately this didn't help.
So does anyone know how to display this?
TIA!
Solved the problem by duplicating the job. The duplicate ran with progress. So it is a kind of corruption inside the original job. By duplication got me rid of the problem.
Ok, but can you tell me how to enable the progress? Which setting do I have to modify?
It used to work, but since yesterday nothing is being displayed during the run in the IDE of the job.(design). The only progress I see is
Starting job personeel at 10:03 25/03/2020.
[statistics] connecting to socket on port 3643
[statistics] connected
[statistics] disconnected
Job personeel ended at 10:08 25/03/2020. [exit code=0]
in the tab Run. The jobs runs fine BTW.
Solved the problem by duplicating the job. The duplicate ran with progress. So it is a kind of corruption inside the original job. By duplication got me rid of the problem.