Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
I converted a QV document into Sense, and imported a pivot table from the QV document. I edited one of the measures, and therefore had to unlink it from the master measure. I loaded more data into the script editor, and all of the measures updated properly except for the one that I edited. Is there a way to link a measure back to the master, or another way to fix what I've done? I'm not entirely sure I understand what it means to 'unlink from the master measure.'