Skip to main content
Announcements
See what Drew Clarke has to say about the Qlik Talend Cloud launch! READ THE BLOG
cancel
Showing results for 
Search instead for 
Did you mean: 
cadetron
Contributor
Contributor

What is the best way to rollup the first 3 months of a 24 months period?

I have a project that was handed to me.  I have to display the trend on 4 different measures over a 24 months period with the most recent three to be at the Trip_Leg detail level.

The data is as follow you have a Trip record and within a trip you will have a Leg_A or Leg_B or Both.

       Trip

         /\

        /  \

Leg_A  Leg_B

2 Replies
MK9885
Master II
Master II

Can you explain more with your scenarios?

As in if you select particular Year or Month what Yr or Month data should it show..?

cadetron
Contributor
Contributor
Author

The most recent 3 including selected needs to be rolled up.