Hi Team,

I am new to Bar chart , I am looking for a requirement to project Files received on a particular week with the timings which i got the Query and need to be projected in bar chart

I am good with X - Axis I plotted the Files on date wise for the week , and i have question with the timings which needs to be projected on Y axis . indicating if the files with in week has reached with in time or not .

I need to draw a threshold line for a particular time , and i need to get the values projected on the Y -Axis with variance of 12 : 00 AM and 12 : 10 AM in such variance instead im getting plotted as 12 : 00 AM and 12 : 02  AM. I need a difference of 10 .


Kindly help me in that .

2 Replies
trdandamudi
Master II
Master II

If you need the variance by 10 then in the chart properties in "Axis" tab check Static Step and put 10.

Not applicable
Author

Hi Thirumala,

Thanks for that.

I did as u suggested but when i put the step in the Y axis is getting vanished .the value which im projecting on y Axis is time . so is there is  way for that u can suggest ,and also to plot on the Threshold .