Skip to main content
Announcements
Qlik Connect 2024! Seize endless possibilities! LEARN MORE
cancel
Showing results for 
Search instead for 
Did you mean: 
Not applicable

Countdown

Hi Guys,

Please I am trying to achieve the following from the screen shoot attached. Hope its possible to work it out.

Begindatum: Should start with the smallest date which is 11/01/2014. I have sorted in ascending order but still no success.

Looptijd: Is a static value but I want it to be counting down e.g 24 then 23 as soon on.

Einddatum: I would like it to be fixed. E.g since 11/01/2016 is is the Einddatum, i want it the same throughout.

Totaal Garantie: Should be counting down as well just like the Looptijd.

Thanks

0 Replies