Help with chart

Hi All,

I am trying to do something in a chart but unsure if it is possible.

Basically i have a bar chart showing how many hours people work over a time period.

i want to also show how many hrs were possible..

i.e.

if a week (5days) is selected, then the bar chart will show the hours worked by the people in that 5 days. on the same barchart i want a line showing how many hours were possible (so 5 days x 7.5hrs = 37.5hrs). so anyone who does not meet the line then i would know i need to find out why.

I have attached a small sample.

Any help would be appreciated.

Thanks

1 Solution

Accepted Solutions
Gysbert_Wassenaar

You can add a reference line to the chart on the Presentation tab of the properties window. You'll have to play around some with the label of the reference line and the maximum of the x-axis scale to find out what works best for you to get the label to display nicely.


talk is cheap, supply exceeds demand

View solution in original post

2 Replies
Gysbert_Wassenaar

You can add a reference line to the chart on the Presentation tab of the properties window. You'll have to play around some with the label of the reference line and the maximum of the x-axis scale to find out what works best for you to get the label to display nicely.


talk is cheap, supply exceeds demand
hopkinsc
Partner - Specialist III
Partner - Specialist III
Author

Thanks Gysbert, i got as far as the reference line part but didnt set the static max on the axis tab.

Thanks, it works perfectly.