I calculate networkdays in the script but the results are wrong while using the same dates in a table in the UI are calculated correct.
These 2 dates: 20/3/2018 to 11/4/2018
calculated in the script as 22 days
and in the UI as 17 days
17 Days is correct.
Dates are loaded in this format 20.03.2018 but changed with this statement: date(date#(<datefields>,'DD.MM.YYYY')'DD/MM/YYYY')
I need the calculation in the script.
QlikView 12 SR3 versio 12.20.20400.0
It should, and this works too:
LOAD NetWorkDays(Date(date#('20.03.2018', 'DD.MM.YYYY'),'DD/MM/YYYY'),Date(date#('11.04.2018', 'DD.MM.YYYY'),'DD/MM/YYYY')) as value
AutoGenerate 1;
That's why I'm askjing for a sample, there should be something else, I'm not sure if the different version is the only reason.
Hi Michiel, I make a document with this script:
LOAD NetWorkDays('20/03/2018','11/04/2018') as value
AutoGenerate 1;
value loads '17'. Can you post a sample that shows the problem, I can't reproduce it (I'm in different version)
See original post for the example.
I tried this also and hardcoded dates in the correct format does calculate correct.
But I expect qlikview to do the same with the date fields that are edited with date and date# functions.
NetWorkDays(Date#('20.03.2018','DD.MM.YYYY'),Date#('11.04.2018','DD.MM.YYYY')) gives me 17
It should, and this works too:
LOAD NetWorkDays(Date(date#('20.03.2018', 'DD.MM.YYYY'),'DD/MM/YYYY'),Date(date#('11.04.2018', 'DD.MM.YYYY'),'DD/MM/YYYY')) as value
AutoGenerate 1;
That's why I'm askjing for a sample, there should be something else, I'm not sure if the different version is the only reason.
I do not have just 2 dates, the 2 dates mentioned are just examples.
I have 2 fields with all the dates.
Strange why setting the date formats inside the networkdays function does the trick.
I did a preceding load thus calling the edited date formats and that does not work.
Do you know why?
Preceding load also returns me '17'. I tried with:
LOAD NetWorkDays(Date1,Date2) as value;
LOAD
Date(date#('20.03.2018', 'DD.MM.YYYY'),'DD/MM/YYYY') as Date1,
Date(date#('11.04.2018', 'DD.MM.YYYY'),'DD/MM/YYYY') as Date2
AutoGenerate 1;
I tried a few things the retrive that '22' but I didn't accomplish, the only way is doing Date2-Date1, so that 22 it's counting all dates, not removing weekends.