Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
I want to use TRACE to get the RELOAD start time and the RELOAD finish time
I then want to add a text box to show the Elapsed time of the RELOAD
start time - finish time = duration of reload
I know it's possible, but I cannot get it to work for me
You would have to place the " LET FinRecarga = now(); " at the end of the script in order to get the last execution time of the script. If your script takes miliseconds to execute, then it will be almost the same time for both variables.
You can use the now function in the script:
LET InicioRecarga = now();
LET FinRecarga = now();
Then use those variables to get the elapsed time.
Hi Carlos,
That gives me the same time for both
so the duration will always be 0
I am looking for something like this
You would have to place the " LET FinRecarga = now(); " at the end of the script in order to get the last execution time of the script. If your script takes miliseconds to execute, then it will be almost the same time for both variables.
Yes that worked
I had both in the main sheet
Thanks a lot Carlos
How do you find the difference between the 2 timestamps?