Hello check the sample data (attached with this post) I have a project, and billable days with revision number I want to calculate the total billable days where Revision Type = 0 - Reference Budget or Revision Name = Reference Budget and Revision number is the last one
so in this case the revision number is 4 and the total should be 745 I wrote the following expression: