Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
Hello Talend community,
I have a simple ETL job developed using Talend open studio, the job read about 70M row from text files and do simple transformations then load the data to oracle database. now I will deploy this ETL job into a production environment and the job will be scheduled to run every day using windows scheduler.
Now I have 2 questions:
1- what are the recommended hardware requirements for the production server?
2- should I upgrade to enterprise edition or I can use Talend open studio in the production environment?
Thanks for your help
1) Please refer to the below link:
https://help.talend.com/r/en-US/7.3/installation-guide-data-integration-windows/hw-requirements