Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
Trying to achieve percent to total as below.
Need Percept over 2015 for 2016 and 2017 like below.
Expected
Year Total %Over2015
2015 60 60/60=100%
2016 30 30/60=50%
2017 20 20/60= 33%
Here 60 is taking from the Min(Year) 2015, and
Example:
Test:
Load * Inline [
Year, Total
2015, 60
2016, 30
2017, 20
];
Trying:
Max(Total)/Max({<Year={2015}>}Total)
appreciate for your help.
Try this
Max(Total)/Max(TOTAL {<Year={2015}>}Total)